Laying new NG piping and C&S works (pipe sleepers) from NG station for boiler & thermal oxidizer.
Construction of IT slab or manhole & sump pit.
After meter natural gas piping for KLCC outlets.
Modification and installation of new piping and ball valve for bulk tank terminal.
Installation of C200 Manifold to support two crematoriums.
Modification & extension of main NG piping including NG piping works at Block B (8 lines).
Laying of new underground piping between new and old factory lot.
Extension of main MDPE piping to individual housing unit with complete accessories for 118 terrace houses.
Conversion of LPG piping to NG piping including at its new Esplanade mall.
Installation of new liquid manifold for plastic moulding production.
NG underground steel piping with HDD method of laying.
New NG reticulations for new shopping mall.
New installation of LGP vapour manifold for the main dining hall.
Upgrade of nitrogen production line.
Installation of new manifold system for its club house at the sales gallery.
Installation of new bulk tank with vapour withdraw for oven usage.
Upgrade of NG piping for new stalls area.
New NG piping to supply tenants lots from GMB station.
Upgrade of LPG liquid manifold system to supply stalls.